3 Results for building activity (Tätigkeit)

  • Berlin Main Station - 2005
    Lowering of the western arch structure for the new Berlin Main Station - Lehrter Station. Each half arch is 43.5 metres long and weighs 1,250 tonnes; photo taken on 29 July 2005, 6 p.m.
    DB4511
  • 2005 - Historical picture - Berlin Hbf - im Bau
    Construction segment: lowering of the western arch structure for the new Berlin Main Station - Lehrter Station. Photo taken on 30 July 2005, 8 a.m.
    DB4532
  • Investitionen im Netz der DB - Neugestaltung von Bahnsteigen
    Investitionen im Netz der DB - Neugestaltung der Bahnsteige im Bahnhof Stendal
    DB175748
Loading